22 GHz FWA: selected English source translations

FWA is outside the transport band-plan list of interest. These selected excerpts retain source material read during the research.

Enacted 2026 upgrade

Source: MIC, 2026-03-25, final publication. Relevant Japanese PDFs: Ordinance 29, Notification 96, and Notification 97.

Ordinance 29, PDF p. 3, adds Article 49-19-2: the communication method of the new 22 GHz land-mobile equipment is frequency-division duplex or time-division duplex. Modulation includes 4FSK, 4PSK, 16QAM and OFDM, or equivalent/better methods. This class uses above 22.0 through 23.2 GHz and has dynamic transmit power control.

Notification 97, PDF p. 3, adds Appendix 10-1 section 2, “frequency-block table used by land-mobile-service stations using the 22 GHz band.” Blocks E1–E24 are successive 50 MHz blocks. In MHz the full table is represented exactly by E[n] = (22000 + 50×(n−1), 22000 + 50×n], for n = 1…24. The lower boundary is exclusive and the upper boundary inclusive.

Notification 96, section 1, PDF pp. 1–2: permitted occupied bandwidth is:

Modulation Limit
4FSK or equivalent/better, modulation index 0.4 fcl × 1.6
4FSK or equivalent/better, modulation index 0.7 fcl × 2.0
4PSK / 16QAM or equivalent/better fcl × (1 + α), α ≤ 0.5
OFDM No greater than one channel's bandwidth

fcl is in MHz. Round a fractional MHz upward to the next 0.5 MHz.

Section 6, PDF p. 4: bandwidth-expansion equipment is limited to TDD. Its expansion limits are:

Reference bandwidth, MHz Maximum expanded bandwidth, MHz
50 200
100 400
200 400

Section 7, PDF p. 5: among available frequencies, automatically choose a channel with the lowest measured electric-field strength from unwanted stations, measured across the channel bandwidth.

The corresponding 2025 committee report, printed p. 88 / PDF p. 91, describes its long-distance FDD example as using two adjacent TDD channels, with no bandwidth expansion. It does not prescribe a 600 MHz low/high pairing for this new FWA class.