Ermis (AlberBlanc/FalconIon) — source notes
The FalconION dossier presents Shimoizumi TX, Maeda RX and the FCC/ITU connections. Company connections.
- Shimoizumi imagery date: the completed grading in Ryota's July site account (English) comes from 20 February 2025 imagery. His 2 March observation refers to the absence of towers; earthworks had already taken place.
- Tokyo span: Ryota's Wakasu/Toyosu investigation (English) gives 33.3 km at 138.3° from the Cube to Shimoizumi. The MIC comparison supplies the Sodegaura–Kōtō 7480/7640 MHz pair.
- Nuvio's California endpoint: the path exhibit and Form 442 use different place names for the U.S. end of the proposed Maeda link. The FCC application note retains both labels and the filed coordinates.