Sora (Tower) — source notes

The Tower dossier presents Kokubo's expansion and DRW handoff. Company connections.

  • Original tower records and bearings: the March 2025 article (English) gives approvals on 26 April 2024 and completion inspections on 5 November 2024 for the two original 35.1 m towers. Its drawing gives both original arrays a 232° bearing, correcting Ryota's initial east/Singapore versus west/Hong Kong split. These records concern the original installation, before the later expansion.
  • DRW handoff chronology: the Sora–NuVo E-band connection was already described in January 2025 (English). The August 2026 visit (English) supplies the close view of its Mother Farm counterpart used in the dossier.