GT Technologies (Optiver) — source notes
The Optiver dossier presents Cosmo West's photographs and routes. Company connections.
- Damage photograph: the report (English) was published 9 February 2026. Its supplied image has a
20260208filename but no capture date. The intact tower photo reused in the August overview is from January 2025; it supplies no later repair observation. - GTT/NuVo assignments: the amendments to Ryota's urban survey (English) use NuVo's electrical service panel to correct the company assignments. The November 2024 route map (English) carries those corrections through Mother Farm and Ariake; the MIC pairing analysis supplies the matching Kōtō–Futtsu–Minamiboso channels.
- Licence wording: besides the destinations and power changes described in the dossier, the September MIC capture uses
送受信所(transmit/receive installation). Ryota's June 2025 copy (English) used送信所(transmit installation).